info@cross.com.gr
(+30) 21 0428 4070
back to category
Grounding units

SCULLY ST-47 Vehicle Static Ground Verification System monitors the ground connection and if that connection is lost, the ST47 will non-permit. Self-proving technology based on Scully’s original patented design.

The unit can operate in conjunction with Scully Overfill Prevention System (ST-35® or ST-15) or as an independent ground verification unit.

Immediately shuts down the loading operation if proper static grounding is not detected

  • Can be used with a variety of loading operations including tank trucks, rail tank cars, aircraft refuelers and tanks, to ensure that transport vehicles are properly tied to ground before and during the loading operation.
  • For stand-alone grounding without overfill prevention, choose the junction box with choice of Scully ground-proving plug or grounding clamp.
  • For static ground verification in conjunction with Scully Overfill Prevention system, wire the ST-47 through Overfill Prevention Control Monitor and plug and cable for one quick overfill protection and static grounding/earthing connection
  • Direct earthing tie-in point at loading rack is available.
read full description
PRODUCT DESCRIPTION

SCULLY ST-47 Vehicle Static Ground Verification System monitors the ground connection and if that connection is lost, the ST47 will non-permit. Self-proving technology based on Scully’s original patented design.

The unit can operate in conjunction with Scully Overfill Prevention System (ST-35® or ST-15) or as an independent ground verification unit.

Immediately shuts down the loading operation if proper static grounding is not detected

  • Can be used with a variety of loading operations including tank trucks, rail tank cars, aircraft refuelers and tanks, to ensure that transport vehicles are properly tied to ground before and during the loading operation.
  • For stand-alone grounding without overfill prevention, choose the junction box with choice of Scully ground-proving plug or grounding clamp.
  • For static ground verification in conjunction with Scully Overfill Prevention system, wire the ST-47 through Overfill Prevention Control Monitor and plug and cable for one quick overfill protection and static grounding/earthing connection
  • Direct earthing tie-in point at loading rack is available.
VIDEO
TECHNICAL SPECIFICATIONS
more technical specifications
less technical specifications