info@cross.com.gr
(+30) 21 0428 4070
Oil & Gas
Skid Mounted Truck Loading System on Ro-Ro Tanker vessel for refined oil products’ distribution to Greek islands
Job Description
  • System was designed according to European Metrology OIML R117 and Greek Metrology.
  • Skid mounting of Contrec 1010A-2/4 Load Computers at CROSS’ workshop.
  • Skid mounting of Metering Blocks including VAF J5100 Flowmeters & Basket type Filter, Bermad Digital Control Valves type AF 718, Bermad Digital On-Off Valves type AF 710, Scully Overfill Prevention System, Silea Cross-Over Bottom Loading Arms and 5×5 pump selection system.
  • Delivery of the separate skids to the Shipyard and assembling of the above in one system, onboard the vessel.
  • System was installed by the Shipyard under CROSS’ instructions.
  • Commissioning of the system was performed by CROSS upon the vessel’s arrival at Piraeus port.
Skid Mounting of Truck Loading stand
Load Computers_ stand Assembled on Skid
Truck Loading Skid’s Construction – phase 1
Truck Loading Skid’s Construction – phase 2
Truck Loading Skid’s Construction - phase 3
Truck Loading Skid’s Construction - phase 4
Truck Loading Skid’s Construction - phase 5
Transportation of Skid to the Shipyard for installation onboard
Truck Loading Skid installed onboard the vessel - entrance view
Truck Loading Skid installed onboard the vessel - Loading Computers side
Truck Loading Skid installed onboard the vessel - side view
Truck Loading Control Room onboard the vessel